Indonesia’s state-owned, vertically-integrated power utility, PT Perusahaan Listrik Negara (PT PLN) has launched a two-envelope bidding process without prequalification for the design, supply, installation, testing and commissioning of pump-turbines, generator-motors and auxiliary equipment for the 1040 MW Upper Cisokan pumped-storage hydropower project, which is under construction in the West Java province. Bids are invited by 10 July.
The Volta River Authority (VRA), Ghana’s main power producer and supplier, has launched the first stage of a two-stage international bidding procedure for consulting services for the installation of a utility-scale floating solar photovoltaic (FPV) power plant on the Kpong reservoir. Expression of Interests (Pre-Qualification) are invited by 7 June for the role of Implementation Consultant.
Pakhtunkhwa Energy Development Organization (PEDO) invites sealed bids by 17 May for the design, supply, installation, testing and commissioning of turbines, generators, electrical system, switchyard and power evacuation for the Gabral Kalam hydropower project in Pakistan's northwestern province of Khyber Pakhtunkhwa. The 88 MW run-of-river project is to be developed with funding from the World Bank under the Khyber Pakhtunkhwa Hydropower and Renewable Energy Development Project.